A brand new landmark development including a 50,000 sqft Grade A office building

Site
plan

Pedestrian entrance

Vehicle entrance

Tram stop 150m

Nottingham Railway Station entrance 50m

Access to canal and towpath

Station Street Site Plan

No. 11 Station Street

11 Station Street will provide substantial brand new Grade A office accommodation featuring large open floor plates in the most well connected location in the City of Nottingham.

It will be one of two new buildings to be built as part of a mixed use scheme.

Frontage
Station Street 11

Scheme
outline

Area Schedule – NET
Level Area m2 Area ft2
Ground Floor 949m2 10,215 ft2
First Floor 1,002 m2 10,785 ft2
Second Floor 1,002 m2 10,785 ft2
Third Floor 950 m2 10,225 ft2
Fourth Floor 815 m2 8,772 ft2
Total 4,718 m2 50,782 ft2

Secure Basement Parking

Scheme Outline Plan

Indicative
floor plate

Ground Floor

Ground Floor Plan

Indicative
floor plate

Upper Floor

1:10 density
Occupancy 90

Typical Upper Floor Plan

Indicative
floor plate

Roof garden, fourth floor

Your own dedicated roof terrace, with enviable views across the city, offering break out and entertainment space.

Fourth Floor, Roof Garden Plan 1:8 Density

Indicative
floor plate

Lower Ground Basement

Basement

Sustainable Grade A specification

  • BREEAM ‘Excellent’ / EPC ‘A’ Rating
  • Flexible large open plan floor plates
  • Impressive large reception and amenity area
  • Floor to ceiling glazing with appropriate solar shading
  • High quality contemporary finishes
  • Minimum floor to ceiling height of 2.7m
  • Services designed for an occupancy of 1 person per 8sqm
  • 24 hour access
  • Secure basement parking including secure cycle store and car charging facility
  • Generous toilet provision to each floor including shower facilities
  • 150mm raised access floors throughout
  • Fibre to the building provisioned
Internal Office
Reception

A focus on
delivery

Development Programme


11 Station Street is in a position to be advanced immediately subject to occupier commitment, with the following indicative timeframe for delivery.

Development Programme